The next day, the Baker-Polito Administration announced a $13.7 million contract to complete the 11.5-mile Northern Strand Trail, which would now dead-end at the site of this long-anticipated bridge.
A February 6 article in the Boston Globe described Encore Boston Harbor’s proposal to replace an 800-foot pedestrian bridge connecting Assembly Row across the Mystic River to the casino with an aerial gondola.